Huntington Ingalls Industries’ Newport News Shipbuilding has given advice and technical input on inserting US technology into the SSN-AUKUS design, while design authority remains with the UK, according to defence minister Luke Pollard.
James MacCleary, the Liberal Democrat MP for Lewes, asked what role the American company plays in designing the submarines.
Pollard, the Minister for Defence Readiness and Industry, replied: “Huntington Ingalls Industries Newport News Shipbuilding (HII-NNS) has provided some advice and technical input regarding US technology insertion into the SSN-AUKUS design. HII-NNS does not hold design authority for SSN-AUKUS, which remains with the UK.
The company’s contribution forms part of broader AUKUS efforts to strengthen tri-national collaboration, submarine enterprise capability and capacity across the UK, US and Australia.”
A US Foreign Military Sales notification reported in March set out a proposed sale to Britain of up to $1 billion in support for the programme, including technical assistance on AUKUS-specific vertical deployment tubes, common weapon launchers and US and UK embedded personnel.
The figure was a maximum estimated value, not a confirmed contract.












I remember just two months ago being told on here that HII was basically designing SSN AUKUS.
I pointed out that a £50 million contract on a program costing £40 billion means they had close to no input and this proves it.
No doubt just like with Astute I’ll need to listen to as**oles wittering on for the next three decades about how these are American designed boats.
The a***holes are already getting ready to claim that Tempest is not a true 6th gen jet and is not 6th Fen because it has vertical tails, it won’t have variable cycle engines etc.
As nobody, to the best of my knowledge has taken an a tail less aircraft supersonic, I think they maybe in for a shock when the aircraft breaks cover.
I agree Michael/Jim. The 6th Gen definition has never specifically defined tail design, at least until US efforts suggest theirs won’t have a semi vertical tail. Ironically there was more mention of canards being anathema to a 6th Gen design, but then that was because the US has always discredited Euro canard designs as fundamentally un-stealthy while a tailless design wasn’t anything like a given and as such no US source expected canards to be utilised in a US 6th Gen design. Now all you read, totally coincidentally I’m sure, is that canards perhaps are not as un-stealthy as once thought, but cranked fins are suddenly not de-rigueur. The whole question is nebulous and nuanced with some aspects better than others on a subjective scale. Just read indeed that the whole initial use of an adaptive engine on the F-47 has serious question marks as such a design with its complexities some suggest won’t be available till at least the mid thirties, on top of hearing doubts that it would not be mature and reliable enough for the navy variant in that time scale. Time will tell no doubt but anyway each manufacturer will bias opinions and stats to suit their own design. Meanwhile the pr team who invented the whole ‘generational’ nomenclature aren’t even in the 6th Gen game.
If the RN get 12 and they’re built in Britain does it matter if they are primarily designed in the US. The Astute design and build was an ongoing disaster until the Americans came over and got it on track.
Yeah and they saved us in the war don’t-cha know, not to mention Trump’s uncle invented radar apparently. We don’t live life in black and white believe it or not. But it matters because if we can’t build submarines independently puts us into the colonial grip of a Superpower which only has interest in their own interests, as presently demonstrated. Sensibly acquiring some help when problems arise saving time, effort and cost is somewhat different one might think. It’s rather like RR gaining some input in its Reactor design against us being totally reliant on buy US reactors if they de due to sell them or what they might demand in exchange. Did we not give them some input on sensor design some time back.
Will they be saving the day when inevitable problems arise, just like during the Astute development and General Dynamics?
Now, about this 85% of Defence direct spend, spent in the UK…
Was the Minister waxing lyrical?
Or just blowing smokevup our hoops?
Presumably with first cut of Aukus due next year??
The Design is Already there..?
I’m sure it is.
Some last minute tweaks though may be made.