An unarmed Minuteman III intercontinental ballistic missile was launched from Vandenberg Space Force Base in California on 17 November in an operational test designated GT-257, according to imagery released by the US Space Force.
The caption released with the images states: “An unarmed Minuteman III Intercontinental Ballistic Missile launches during an operational test at 11:01 Pacific Time, 17 Nov, 2026, at Vandenberg Space Force Base, California. ICBM test launches help ensure the U.S ICBM fleet is ready, reliable and effective.”
It was the third Minuteman III test this year, after GT-255 in March and GT-256 in May, and Air Force Global Strike Command said it was scheduled years in advance and not in response to world events, according to MigFlug. Two officers of the 625th Strategic Operations Squadron flew aboard a US Navy E-6B Mercury to carry out the launch using the Airborne Launch Control System, a backup to underground launch control centres.
GT-255 in March carried two test re-entry vehicles to a pre-determined target at Kwajalein Atoll in the Marshall Islands, the UK Defence Journal reported. General S.L. Davis, commander of Air Force Global Strike Command, said at the time: “It is critical to test all aspects of our ICBM force”.
GT-254 in November 2025 was also launched from an E-6B, and its re-entry vehicle travelled about 4,200 miles to the Ronald Reagan Ballistic Missile Defense Test Site, according to UK Defence Journal reporting. Maj Dalton Douglas of the 625th Strategic Operations Squadron said: “The ALCS provides the nuclear forces a survivable and secondary capability to transmit launch commands to our ICBMs”.
The Minuteman III is due to be replaced by the LGM-35A Sentinel, and in March construction began on a full-scale prototype launch silo at Promontory, Utah, to test a modular design for up to 450 future silos, with a flight test planned for 2027 and initial operational capability expected in the early 2030s, the UK Defence Journal reported. Gen. Dale White said: “The new silo design delivers operationally relevant capability on a predictable cost and schedule”, while Brig. Gen. William Rogers said: “This prototype is a critical step in proving the design and reducing risk before production”.











